top of page
CAMPUS LEASING

Campus Leasing

Power-First Hyperscale Capacity in Millville, New Jersey

The Millville Energy & A1 Data Center Campus provides institutional tenants with power-first redevelopment certainty and mission-critical infrastructure designed for AI and high-density long-duration workloads.

Power Availability & Reliability

The Millville campus offers a robust utility environment with a designated pathway to 1.4 GW. Our redundant dual-feed architecture ensures operational continuity for the most intensive AI and hyperscale workloads.

Infrastructure

1.4 GW

Strategic Power Pathway

Live Capacity

49 MW

Immediate Availability

Resilience

Dual-Feed

Redundant Infrastructure

Contracts

Long-Term

Infrastructure Certainty

CAMPUS ARCHITECTURE

Campus Scale & Configuration

The 66-acre industrial campus is positioned within a certified redevelopment zone, providing long-duration infrastructure certainty. Engineered for the extreme requirements of hyperscale and AI workloads, the site offers unprecedented scalability in the Northeast corridor.

66-Acre Industrial Campus

Fully entitled industrial platform optimized for high-occupancy mission-critical architecture.

High-Density Power Zones

Infrastructure engineered for extreme rack densities, supporting up to 50kW+ per cabinet.

Phased Build-to-Suit

Flexible delivery models ranging from powered shell to turnkey technical space deployments.

AI & GPU-Ready Design

Liquid cooling ready and structural reinforcement for massive HPC hardware clusters.

Next Steps for Prospective Tenants

Institutional tenants and leasing teams looking to secure hyperscale capacity at the Millville Energy & A1 Data Center Campus are invited to coordinate with our technical and municipal stakeholders. Follow the protocol below to initiate formal site vetting and technical due diligence.

  • Request confidentiality documentation
  • Schedule a technical deep dive
  • Coordinate with municipal & utility stakeholders
bottom of page