CAMPUS LEASING
Campus Leasing
Power-First Hyperscale Capacity in Millville, New Jersey
The Millville Energy & A1 Data Center Campus provides institutional tenants with power-first redevelopment certainty and mission-critical infrastructure designed for AI and high-density long-duration workloads.
Power Availability & Reliability
The Millville campus offers a robust utility environment with a designated pathway to 1.4 GW. Our redundant dual-feed architecture ensures operational continuity for the most intensive AI and hyperscale workloads.
Infrastructure
1.4 GW
Strategic Power Pathway
Live Capacity
49 MW
Immediate Availability
Resilience
Dual-Feed
Redundant Infrastructure
Contracts
Long-Term
Infrastructure Certainty
CAMPUS ARCHITECTURE
Campus Scale & Configuration
The 66-acre industrial campus is positioned within a certified redevelopment zone, providing long-duration infrastructure certainty. Engineered for the extreme requirements of hyperscale and AI workloads, the site offers unprecedented scalability in the Northeast corridor.
66-Acre Industrial Campus
Fully entitled industrial platform optimized for high-occupancy mission-critical architecture.
High-Density Power Zones
Infrastructure engineered for extreme rack densities, supporting up to 50kW+ per cabinet.
Phased Build-to-Suit
Flexible delivery models ranging from powered shell to turnkey technical space deployments.
AI & GPU-Ready Design
Liquid cooling ready and structural reinforcement for massive HPC hardware clusters.
Next Steps for Prospective Tenants
Institutional tenants and leasing teams looking to secure hyperscale capacity at the Millville Energy & A1 Data Center Campus are invited to coordinate with our technical and municipal stakeholders. Follow the protocol below to initiate formal site vetting and technical due diligence.
- Request confidentiality documentation
- Schedule a technical deep dive
- Coordinate with municipal & utility stakeholders