CURRENT STATUS // INFRASTRUCTURE
A1 Power (B) 100 MW Substation
Engineered for hyperscale dominance, the 100 MW Substation platform provides mission-critical power certainty and industrial-grade high-voltage architecture at the core of the Millville Energy Campus.
Voltage & Feed
Dual 69kV transmission lines with redundant high-capacity transformers providing immediate 100 MW industrial throughput.
Technical Specifications
Industrial-grade electrical architecture engineered for 100% hyperscale availability.
Redundancy Model
N+1 configuration for all primary switchgear and mission-critical MEP systems, maintaining zero downtime operational targets.
Grid Connection
Direct multi-point utility integration ensures rapid power restoration and load balancing across the full campus horizon.
[ DEVELOPMENT ROADMAP ]
01. Near-Term: 100 MW
Capacity Evolution & Phased Timeline
Activation within 6–12 months. Secured substation capacity for initial hyperscale clusters and high-density HPC environments.
02. Mid-Term: 400 MW
Phased expansion powered by integrated on-site gas generation and dual-feed substation upgrades. Designed for sustained AI workload growth.
// CURRENT STATUS: READY TO BUILD
Full entitlements secured for 100 MW expansion. Infrastructure pads and substation priority confirmed for 2026 activation.
03. Scale Horizon: 1.4 GW
Long-term blueprint for mission-critical dominance. Full utilization of the 66-acre industrial campus with vertical technical expansion.
Qualified Partnerships
Schedule a Site Briefing