top of page

COORD/LOC: MILLVILLE_NJ_S1

Power Certainty. Scale for Hyperscale Infrastructure.

59 MW

Live Today

100 MW

Near-Term Development

1.4 GW

Potential Scalability

STATUS: POWER_AVAIL_READY

CORE CAMPUS POSITIONING

Engineered for Hyperscale Dominance.

The Millville Energy & Data Center Campus is a 66-acre development platform designed to solve the most critical constraint in AI and cloud infrastructure: power certainty. Purpose-built for high-density HPC workloads.

66 ACRES

Fully Industrial-Zoned Campus

Entitled for mission-critical architecture and high-occupancy hyperscale data centers.

LAT: 39.4007° N

LONG: 75.0291° W

// SYSTEM READY // FULLY ENTITLED

TARGET WORKLOADS

AI / HPC / HYPERSCALE

TENANCY MODEL

BTS / POWERED SHELL

Status: High-Power Entitled

Power Infrastructure & Scale Milestones

Millville Energy & Data Center Campus offers immediate power certainty with a multi-layered redundancy model and a clear expansion trajectory for hyperscale AI deployments.

59 MW Live Capacity

Immediate availability today including 49 MW via redundant substation feeds and 10 MW on-site gas turbine generation.

01

84-Car Rail Agreement

Secured propellant rail car capacity for redundant fuel supply. On-site handling and storage for total energy independence.

04

100 MW Substation

Targeted activation within 6–12 months. Expansion pathway for phased hyperscale deployments with power certainty.

02

High-PSI Gas Main

Existing 8-inch and 6-inch gas lines present at 120 PSI, supporting large-scale high-availability generation on-campus.

05

1.4 GW Scale Horizon

Long-term blueprint for dispatchable generation, positioning Millville as a primary alternative to congested regional markets.

03

Multi-Layer Redundancy

Mission-critical 5-acre on-site freshwater pond and dual production wells provide thermal redundancy for AI cooling clusters.

06

Commercial Framework & Leasing

Millville provides institutional-grade lease structures tailored for hyperscale cloud providers and AI infrastructure operators. Our commercial models focus on power certainty, long-term operational resilience, and capital efficiency across a 10–25 year horizon.

10–25 Year Institutional-Grade Lease Structures

Powered Shell and Build-to-Suit Delivery Options

Phased Expansion Scalability up to 1.4 GW

Dedicated or Shared Critical Generation Options

Aligned with Tier 1 Cloud Operator Compliance

Fiber Backbone Infrastructure

Minimum 96 Strands | Carrier-Class Reliability

The Millville campus features a robust, mission-critical fiber architecture designed for low-latency hyperscale deployments. With redundant route protection and direct integration into major carrier hubs, we ensure continuous high-speed data transmission for AI workloads and mission-critical cloud services.

System Redundancy

Engineered for Power Certainty and Operational Continuity

Critical Gas Infrastructure

The campus is served by high-pressure existing 8-inch and 6-inch gas lines operating at 120 PSI, enabling on-site dispatchable generation for mission-critical fuel independence.

Water & Cooling Systems

A 5-acre on-site freshwater pond provides substantial cooling capacity, supplemented by two dedicated on-site wells for multi-source water redundancy.

Redundant

Multi-Layer Mission-Critical Architecture

Our architecture implements N+1 and 2N redundancy across all critical MEP systems, ensuring zero downtime for hyperscale and HPC workloads.

Dedicated diversely routed connectivity tunnels and carrier-neutral fiber paths safeguard data integrity and high availability.

100%

Uptime SLA Ready

2.9M SQ FT

Scale & Build Capacity

A 66-acre industrial-zoned energy campus designed for high-density hyperscale, AI, and enterprise data center deployments with unprecedented vertical expansion.

BUILDABLE AREA

~2.9M SQ FT

Maximum optimized footprint across a fully entitled 66-acre industrial campus.

MAX VERTICAL

150 FT HEIGHT

Building heights expandable up to 150 feet for multi-story data center operations.

DEVELOPMENT

PHASED GROWTH

Strategic phased development approach aligned to hyperscale tenant expansion demands.

OPTIMIZATION

AI & HPC READY

Design optimized for high power density and vertical technical expansion.

STRATEGIC POSITIONING // 007

MARKET ADVANTAGE & ACCESSIBILITY

COORD: 39.4012° N, 75.0321° W

SITE SCAN: OPTIMAL

PHILADELPHIA & ATLANTIC CITY

35 MINUTES

Direct proximity to major regional commercial and industrial hubs via low-congestion transit corridors.

NYC METRO AIRPORTS

Efficient access to international transit infrastructure without the high-cost barrier of Northern NJ.

1.5 – 2 HOURS

THE POWER ALTERNATIVE

Millville offers faster time-to-market and immediate power certainty over the congested Ashburn and Northern NJ markets.

POWER RICH

DOWNLOAD LOGISTICS REPORT

SEC_08: INCENTIVES

BUILD_READY_2026

Economics & Strategic Incentives

The Millville campus provides a robust framework of approved financial incentives and expedited regulatory support to maximize your capital efficiency.

ABATEMENT_APPROVED

15-Year Tax Break

A long-term tax abatement plan is already approved, significantly reducing operational expenses and enhancing investment certainty.

RD_AGREEMENT_STATUS

Redevelopment Hub

The existing Redevelopment Agreement ensures a streamlined approach to land use and infrastructure modernization across the 66-acre site.

FAST_TRACK_PROTOCOL

Expedited Permits

Accelerated planning and construction approvals are available, delivering a faster path to commissioning and live operations.

STATUS: READY FOR INQUIRY // 1.4GW PATHWAY

Schedule a Confidential Discussion

Connect with our infrastructure development team to explore hyperscale leasing opportunities, build-to-suit capacity, and long-term energy strategic partnership.

CAMPUS LOCATION

Millville, New Jersey, USA

GENERAL INQUIRIES

inquiries@millvilleenergy.com

Request Information

Contact Us

We'd love to hear from you. Send us a message and we'll respond as soon as possible.

How can we help you?

Add your text

MARKET ANALYSIS // POWER CERTAINTY

COMPETITIVE POSITIONING

CRITICAL METRIC

Power Availability

Permitting Velocity

Expansion Capacity

Cost Structure

MILLVILLE CAMPUS

1.4 GW Long-term Pathway

Expedited Redevelopment

66 Acres / 2.9M SF

15-Year Tax Abatement

ASHBURN / NOVA

Critically Constrained

18-36 Month Average

Extreme Land Scarcity

Premium Grid Pricing

NYC / NORTHERN NJ

Limited Expansion

Complex & Prolonged

Highly Fragmented

High Utility Levies

// Data based on regional market reports Q4 2025. Millville provides immediate scalability where traditional markets face grid lockdowns.

[ MISSION-CRITICAL PLATFORM ]

Power Certainty. Hyperscale Ready.

Millville Energy & Data Center Campus is a 66-acre platform delivering immediate power availability and long-term scalability. Purpose-built for AI infrastructure and hyperscale deployments.

LIVE CAPACITY

59 MW

Operational today via 49MW redundant substation and 10MW gas generation.

6–12 MONTHS

100 MW

Entitled substation capacity secured for near-term hyperscale deployments.

TOTAL POTENTIAL

1.4 GW

Gigawatt pathway via on-site generation and 84-car dedicated rail infrastructure.

a1 data.png
BUILD CAPACITY

2.9M SF

Expandable industrial-zoned campus optimized for high power density workloads.

bottom of page